Vinci Building Choose Pod Technology for Bristol

8th March, 2023

Offsite Solutions has been awarded its second student living contract at the University of the West of England's Frenchay Campus in Bristol – a £1.7million project to manufacture 757 bathroom pods for VINCI Building.

Offsite Solutions has delivered 16 pod projects for VINCI Building to date which includes major student accommodation schemes for universities in Swansea, Cardiff, Coventry, and Liverpool. This latest project is for the University of the West of England (UWE Bristol) – and it is Offsite Solutions' third for this university.

This highly sustainable development is one of the largest Passivhaus projects in the UK. It is designed to provide a high level of comfort for students whilst using very little energy for heating and cooling, helping UWE Bristol and VINCI Building to meet their environmental aspirations.

As part of the certified low carbon strategy, the buildings aim to yield a reduction of around 50% in running costs and carbon emissions. To help achieve this, the cold water pipework in the bathroom pods will be insulated and the thermostatic shower and mixer taps for the hand basins are designed to run at lower temperatures. Both of these measures will reduce energy consumption for heating hot water.

Steve O'Leary, Regional Business Services Manager at VINCI Building, said: "I have managed the procurement and delivery of around 3,500 pods manufactured by Offsite Solutions in the past nine years. Their approach suits VINCI Building's model of student accommodation very well. They have robust factory testing processes in place which mean the quality is better and more consistent. In my view, Offsite Solutions' pods are the best in their sector and I would not hesitate to recommend.

"This solution reduces the numerous trades for bathroom construction to a single supplier, which results in a considerable time saving. Each bathroom typically takes around three weeks to construct traditionally, whereas with offsite manufacturing, we just have to position the pods, make connections, and hang the doors. This is incredibly fast."

James Stephens, Managing Director of Offsite Solutions, said: "This is an exciting development which will help to meet the rising demand for modern, high quality student living whilst demonstrating a clear commitment to addressing climate change issues. It is a ground-breaking project which will set new standards for the development of sustainable student accommodation."

Due for completion for the 2023/24 student intake, this phase of the Frenchay Campus development will provide 900 bedspaces in three buildings spanning over 26,000sqm and in clusters of four, six and eight bedrooms and with ensuite or shared bathrooms. The shower pods have a robust and low maintenance GRP construction. Each will be fully finished in Offsite Solutions' Somerset factory and will be fitted with a D-shaped wall-mounted hand basin, wall-hung toilet with dual flush, thermostatic shower, and sliding shower door.

Source: www.offsitesolutions.com

Read the full story, go to Offsite Magazine


Share this content

 


Comments

Enter your name and your comment below. Your e-mail address will not be published on the website.