INNOVARé - ROCKWOOD ACADEMY

Project Details

Project - Rockwood Academy

Sector - Education

Technology - Offsite/Modular

Company - Innovare


Project Overview

Morgan Sindall Construction worked in partnership with Innovaré to complete the expansion of the existing Rockwood Academy. The scope of works for the £14 million programme included the design, manufacture and assembly of a two-storey 2,200 ft2 building. An additional ten classrooms were built together with a new atrium, library, further science laboratories, a drama studio and a new multi-use games facility. The main structural frame used an innovative offsite modular structural insulated panel system (SIPS) to deliver superior performance and quality. The design champions the use of Innovaré’s BBA Approved i-SIP System – which outperforms traditional building methods, accelerates project delivery, reduces waste and improves sustainability. i-SIPS panels are one of the most thermally efficient structural solutions, and by opting for this innovative offsite method of construction, the team managed to maintain programme and reduce risk which was hugely important at the height of the COVID-19 pandemic. Advanced offsite construction techniques enabled the project to be cost effective whilst being highly energy efficient – reducing heating requirements for the lifetime of the school.